Free Shipping on All Orders
Lemon

Support

9" Dual-Zone Splash on Alesis Command

Wiring, module settings, and tips for the 9" Dual-Zone Splash when used with the Alesis Command.

Setup — 9" Dual-Zone Splash on Alesis Command

Works

The 9" Dual-Zone Splash is fully supported on your Alesis Command.

Bow Edge

Wiring: 1× TRS → Crash 1 connector on the cable snake, or 1× TRS → Crash 2 jack on the rear panel

Crash 1 is on the cable snake (TRS). Crash 2 is a ¼″ TS jack on the rear panel (mono only — edge zone will not function on Crash 2). For full 2-zone operation, use the Crash 1 snake connector.

Cable routing

  1. For full 2-zone: Connect a ¼″ TRS cable from the cymbal to the Crash 1 connector on the cable snake.
  2. Alternative (mono only): Connect a ¼″ cable from the cymbal to the Crash 2 jack on the rear panel.

Module settings

  1. Go to Kit → Menu → Trigger. Select the Crash input.
  2. Adjust Sensitivity, Threshold, Curve, and Rim Sens.
  3. Set Head-Rim Adj to balance bow and edge response.

Tips

  1. Crash 2 on the rear panel is TS (mono) — it will trigger the bow zone only.
  2. Xtalk parameter can reduce false triggers from nearby pads.
  3. Retrig Cancel helps prevent double triggering on hard strikes.